Orbit Valves 16" Class 1500 Ball Valve - Stainless Steel 316

OEM Image
Used Equipment
Seller Photos
Installation
Nameplate
Dimensional
CAD Drawing
Orbit Valves 16

Product Description

The Orbit Valves 16" Class 1500 Ball Valve - Stainless Steel 316 is a premium industrial valve designed for demanding process applications. This Orbit Valves ball valve features a 16-inch bore, Class 1500 pressure rating, and Stainless Steel 316 body construction, making it suitable for high-temperature, high-pressure service in refineries, chemical plants, and power generation facilities.

At ValveBuyer.com, we purchase surplus Orbit Valves ball valves in any condition. Whether your valve is brand new in the box, lightly used, or even damaged, we can make you a competitive cash offer. Call 954-466-3107 for an immediate quote.

Specifications

ManufacturerOrbit Valves
Valve TypeBall
Size16" (406mm)
Pressure ClassClass 1500 (ANSI 1500)
Body MaterialStainless Steel 316 (CF8M)
End ConnectionFlanged (RF)
Design StandardAPI 600 / ASME B16.34
Face-to-FaceASME B16.10

Estimated Value Range

ConditionPrice Range
Excellent / New Surplus$7,888 - $23,664
Good / Used$3,155 - $11,832
Scrap / As-Is$788 - $3,155

* Prices are estimates. Call 954-466-3107 for an exact quote on your specific valve.

Get a Quote for This Valve

Expert Repair & Failure Analysis

Related Model: Orbit V — Rising Stem Ball Valve. Sizes 2"-24", Classes 150-2500. Application: Severe service, zero-friction sealing.

What Usually Goes Wrong

Stem Packing Leak: Packing gland develops external leak due to thermal cycling, vibration, or age. Visible as weeping or dripping at the stem. Common after 3-5 years without maintenance.

Repair: Replace packing rings (typically 5-ring Grafoil set). Torque gland bolts to manufacturer spec. Can often be done in-line without valve removal. Lead time: 1-3 days with parts on hand.

Seat Damage/Scoring: Metal seats develop scoring from pipeline debris (sand, scale, weld slag). Causes through-leakage that worsens over time. Most common in Pow-R-Seal valves after 5-7 years of service.

Repair: Seat lapping or replacement. Remove gate, lap seat faces to 2-3 helium light bands flatness. If scoring exceeds 0.010", seats must be replaced. Lead time: 2-3 weeks for seat machining.

Repair Lead Time

Complete overhaul: 4-8 weeks — full teardown, all internals replaced, hydro tested

💡 In most cases, selling as-is to ValveBuyer.com is faster and more economical than third-party repair. We buy valves in ANY condition. Call 954-466-3107 for an instant quote.